This playbook outlines the process for sending a UAT (User Acceptance Testing) tracker to smaller clients who don’t require the full project tracker workbook.
When to Use This Process
- Working with smaller clients
- Client only needs UAT tracking functionality
- Large project tracker would be overwhelming or unnecessary for the client’s needs
Step-by-Step Process
1. Determine Client Needs
- Assess whether the client needs a full project tracker or just UAT functionality
- For smaller clients, default to the simplified UAT-only approach
2. Prepare the UAT Tracker File
- Download the master file from the project folder
- Rename the file appropriately for the client
- Save to your local drive
- Delete unnecessary sheets from the workbook:
- Remove all sheets that the client doesn’t need to see
- Keep only the UAT-related sheets
- Hide or lock any remaining sheets that contain internal information
3. Prepare Client Instructions
- Include clear, written instructions for the client
- Keep instructions simple and straightforward
- Focus on how to use the UAT tracker effectively
- Avoid overly wordy explanations
4. Send to Client
- Send the cleaned-up workbook with instructions
- Ensure the client understands how to navigate and use the tracker
Quality Control Process
Before Sending
- Team Review: Send the prepared instructions back to the team for review before publishing
- Content Check: Team members should verify:
- Language makes sense
- Nothing important is missing
- Instructions are not too wordy
- Content is appropriate for a collaborative document
Review Participants
- Include relevant team members (Mike, Angela, Birdi) in the review process
- Each reviewer should check from their area of expertise
Key Principles
- Keep it simple: Don’t overwhelm smaller clients with unnecessary complexity
- Collaborative approach: UAT is a collaborative document between client and team
- Client-focused: Remove internal sheets and information the client doesn’t need
- Clear communication: Provide straightforward instructions without jargon
File Management
- Store the master tracker in the appropriate project folder
- Maintain version control when creating client-specific versions
- Ensure proper naming conventions for client deliverables
Notes
- This process is specifically for smaller clients who don’t need the full project tracker
- For larger projects (like CLRI), use the full project tracker process instead
- Always customize the approach based on client size and needs